Problem viewing email? View online version
Hot Rod Week to Wicked: 1958 Chevy Apache!
Shop CPP
HOT ROD's Week to Wicked: 1958 Chevy Apache
Shop CPP
Week to Wicked
Week to Wicked
CPP
DAY 1

Week to Wicked is back, and so is the crew from Classic Performance Products, Inc. (CPP) to assist Hot Rod Magazine and Sta-Bil Performance Chemicals' 60 year celebration project. Follow the week long build progress, as the crews work together to turn this 1958 Chevy Apache into one wicked shop truck...in only one week!

Full Story
break
CPP
DAY 2

Day 2 picked-up the pace, with the front clip and the front end stripped down to the bare frame and ready to weld in the CPP Mustang II front cross-member and top hats. Then the tubular control arms, spindles, coil overs, disc brakes, as well as rack and pinion steering were bolted on to make this truck drive more like a modern vehicle. With the cross-member welded into place the truck was ready to receive the LS3 powerplant accompanied by a 4L65E automatic overdrive trans.

Full Story
Week to Wicked
CPP
DAY 3

Sparks fly and wrenches spin, as Day 3 keeps the momentum of the build rolling. The new LS3 powered drivetrain gets fully installed in place with CPP's FitRite adjustable engine mounts and Totally Tubular transmission crossmember. CPP's new Midnite Series Power Brake Booster gets mounted to the firewall, and brakelines plumbed to all four corners of the CPP 4-wheel disc brake system. CPP Midnite Series steering shaft U-joints make a clean connection between the CPP power rack-and-pinion and the ididit steering column.

Full Story
Week to Wicked
CPP
DAY 4

Today's tasks for Day 4 were to get the fuel system plumbed and installed, bolt up the accessory drive, hang the exhaust, wire the gauges, bleed the CPP brakes, and ditch the factory tank behind the bench seat in favor of a CPP aluminum EFI-ready fuel tank kit that mounts in the rear of the truck under the bed. We're ticking boxes on the ever-shrinking to-do list, but there's still a lot of time-eating details left to do before we can burn some rubber. Stay tuned!

Full Story
Week to Wicked
CPP
DAY 5

The crew dialed in the details for Day 5, connecting the drivetrain to the rear-end before lowering the truck to finish the bulk of the under-hood wiring. The Apache finally got set down on all four corners of CPP's Ultimate Performance Package, with Viking coil-overs up front, and those slick American Legend rally-style wheels all the way around. From there, fluids were filled, batteries were bolted in, and everyone stood back as this (now) wicked shop truck woke up for the first time. With a smooth, throaty idle, we load it up for a little "road test"...Don't miss the video!

Full Story
Week to Wicked
FOR ALL COVERAGE AND MORE!:
classicperform.com

FB/ClassicPerform

FB/HotRodMag

FB/CarCraftMag

FB/PopHotRoddingMag

FB/StreetRodderMag

classicperform.com

@ClassicPerform

@HotRodMagazine

@StaBilBrand

@AmericanLegendWheels

#WeektoWicked

classicperform.com

HotRod.com

HotRod.com

ClassicPerform.com

GoldEagle.com

CPP Featured Projects


#WEEKtoWICKED
Week to Wicked
Shop Online for More Steering, Brakes, Suspension, & LS Components!
CPP
Order by Phone:
888-522-8309
Order by fax: 714-522-2500
www.ClassicPerform.com
378 E. Orangethorpe Ave., Placentia, CA 92870
Social Media Facebook
Facebook
Instagram
Instagram
YouTube
YouTube
Twitter
Twitter
classicperform.com
Email
Social Media

Hot Rod Magazine's: Week to Wicked 1958 Chevy Apache

Photography and video coverage has been provided for use with permission courtesy of Hot Rod Magazine, a division of TEN: A Discovery Communications Company.

© 2018 Classic Performance Products, Inc.